Vertical 04 · First vertical proof

Engineered to Earn Trust.

Bilingual capability statements, project portfolio registers, verified registration strips, and tender-ready proposals. Built for procurement engineers who buy risk reduction — not creative agency theatre.

Capability statement

Procurement proof

Verified

Registration strip

SCE reference
MOMRA grade
ISO 9001:2015

Scope

Value

Approval

ITP scorecard

Technical review on first read

Project proofComplete
Arabic reviewSigned
Evidence chainTraceable
PDPLCompliant
Compliance posture

Show only when verified.

Verified

SCE

Saudi Council of Engineers

Verified

MOMRA

Grade displayed when current

Verified

ISO 9001

Quality management

Documented

ISO 14001

Environmental

Documented

ISO 45001

OH&S

Pending

IKTVA

Aramco vendor program

Badges render only when current and verified. We don't display lapsed certifications.

Decision console

Pick the route before the scope.

Use this room before a proposal call: confirm the pressure, inspect what must be credible, and see the first handoff before a scope is agreed.

Buyer fit

Decide if this is the right route.

Saudi civil engineering firms pursuing NEOM / Qiddiya / Diriyah

Engineering Firms · Vertical proof

Active SCE registration
Pursuing Royal Commission / RCJY classifications
Need bilingual procurement-ready proof
Book this route

Tender file

Turn capability into reviewer evidence.

Engineering buyers need a project register, certificate posture, capability fit, and submission packet in one serious room.

Tender review

Engineering Firms · Vertical proof

File 01

SCE

File 02

ISO

File 03

Projects

File 04

HSE

Editable route report

Pressure

85

Procurement engineers buy proof. We make yours visible, verifiable, and tender-ready.

Proof

77

Reference case

Handoff

80

Submission

1

Buyer scene

Bid review

Procurement engineers buy proof. We make yours visible, verifiable, and tender-ready.

2

Pressure cue

MOMRA grade visibility (when verified)

SCE registration strip on every page

3

Decision cue

Bilingual capability + tender response

The page should make the first buyer decision visible before proposal scope.

Engineering buyers are different

We don't inflate MOMRA grades.

Engineering buyers ask whether the firm can carry risk. Inflated grades, lapsed certificates, and recycled stock photos fail that review before the first call. Registration grades, SCE numbers, logos, and project values show only when current and permitted.

Reference case

Al-Murjan Engineering

Tender turnaround

14 days

Technical qualification

3.7×

Technical reviewer first read

Tender file, not agency brochure.

REGRegistration proofSCE, MOMRA, ISO, vendor files.
CAPCapability fitScope, discipline, plant zone, crew.
PRJProject evidenceComparable jobs, role, photos, releases.
SUBSubmission packetCover, profile, HSE, Arabic log.
What ships

Eight artifacts. One procurement system.

Each artifact is built to be CRM-extractable, RFP-injectable, and Arabic-review-gated. No marketing brochures dressed as proof.

01

Bilingual capability statement

Output · 28-page master pack (PDF)

Arabic-first hierarchy (English parallel proofing)

02

Project portfolio register

Output · 40+ project entries (xlsx + PDF)

Structured project entries (scope, value, status)

03

Verified registration strip

Output · component embedded in site footer + headers

SCE, MOMRA grade, ISO certifications

04

Tender proposal template

Output · editable template (Word + PDF)

EN + AR cover formats

05

Company profile · EN + AR

Output · 14-page profile (PDF)

Print-ready + WhatsApp-share variants

06

Careers page (Iqama / Saudi ID upload)

Output · live page + 5 sample postings

Saudization signal for Nitaqat improvement

07

HSE notes + safety messaging

Output · 4-page HSE module on site

Site safety statement (EN + AR)

08

Leadership with SCE numbers

Output · leadership page + bilingual bio cards

Engineering principals named

Tender-ready operating system

Five-step tender-ready operating system.

From RFP intake to post-mortem. Each step has a named owner, an acceptance gate, and a defined artifact.

Step 01Bid lead

RFP intake

Buyer + scope + deadline catalogued

RFP intake card (CRM)

Step 02Brand + project register lead

Capability injection

Capability + project modules selected

Tender draft v1

Step 03Native Arabic reviewer

Arabic review

Public Arabic copy approved + audit log filed

Reviewer sign-off (PDF)

Step 04Bid lead + commercial director

Submission

Submitted on portal · receipt logged

Submission receipt + tender PDF

Step 05Bid lead + growth lead

Post-mortem

Result tracked · learnings filed

Post-mortem note (1-page)

Pricing

Pricing in SAR. Setup + retainer.

Engineering work scales by tender velocity. Setup builds the proof system; retainer keeps it sharp through every bid.

One-off projectChosen

Engineering setup

SAR 18,000–38,000

30% start · 30% mid · 40% on launch10–14 weeks
Monthly retainer

Tender retainer

SAR 5,000–10,000 / month

Monthly in advanceActivated after setup launch

Pricing scales by project volume and tender velocity. We quote after a 30-min audit call. SAR-only invoicing. ZATCA-ready.

Ready when you are

Start with the engineering audit.

Send your latest capability statement or tender response. We'll come back with a procurement-readiness audit + a working range inside 2 business days.

One Saudi business day · Founder-led · NDA-ready